by Jonathan McGaha | December 31, 2015 12:00 am

Four C’s Construction installed 5,029 square feet of CENTRIA’s 22-gauge, horizontal CS-260 Concept Series Concealed Fastener Panels in Mocha with a smooth finish and Fluorofinish coating on Delano Police Department’s headquarters in Delano, Calif. The 36,653-square-foot facility houses more than 80 employees, which serve 52,000 residents. The project was completed in September 2013.
Architect: WLC Architects Inc., Rancho Cucamonga, Calif.[1]
General contractor: Tarlton and Son Inc., Fresno, Calif.[2]
Dealer: Blackwood Associates Inc., Fairfield, Calif.[3]
Installer: Four C’s Construction, Fresno[4]
Metal wall panels: CENTRIA, Moon Township, Pa., www.centriaperformance.com[5]
Source URL: https://www.metalarchitecture.com/projects/concealed-faster-panels-clad-police-station/
Copyright ©2026 Metal Architecture unless otherwise noted.