by Jonathan McGaha | February 14, 2012 12:00 am
Completed in July 2010, Filer Intermediate School in Filer, Idaho, is a 61,674-square-foot facility. Brennan Construction Inc., Pocatello, Idaho, served as the general contractor while the school was designed by Hutchinson Smith Architects, Boise, Idaho. Caldwell, Idaho-based Roofing contractor, Upson Co., installed 46,928 square feet of Houston-based MBCI’s 24-gauge SuperLok standing seam roof panels in MBCI’s Signature 300 Colonial Red paint color. The school also features 5,200 square feet of MBCI’s 24-gauge FW-120 panel in MBCI’s Signature 300 Brownstone.
MBCI, www.mbci.com
Source URL: https://www.metalarchitecture.com/projects/filer-intermediate-school-filer-idaho/
Copyright ©2026 Metal Architecture unless otherwise noted.