by Christopher Brinckerhoff | October 2, 2017 12:00 am

Parkhill Smith and Cooper specified zinc panels for First Presbyterian Church’s renovation project in Midland, Texas. The project included a new bridge connecting the church’s existing wings, spaces for children and canopies that provide shade to a terraced amphitheater that surrounds an outdoor plaza.
Shepard Roofing Corp. installed 7,000 square feet of Umicore Building Products Inc.’s 0.8-mm QUARTZ-ZINC VMZ Flat lock panels on the façade and fascia of the building. The project was completed in March 2015.
Source URL: https://www.metalarchitecture.com/projects/zinc-renovates-church/
Copyright ©2026 Metal Architecture unless otherwise noted.