MBCI, Houston,Texas, now offers the Double-Lok Hi-Thermal Clip to accommodate new energy code requirements. Because energy efficiency code requirements are becoming more stringent, many climate zones now require six inches of fiberglass insulation in combination with a one-inch thick thermal spacer. Using a standard clip results in over-compression of the fiberglass batt and leads to seaming and aesthetic problems. The Double-Lok Hi-Thermal Clip holds the MBCI Double-Lok panel two inches above the purlin or joist. This two-inch space will allow for six inches of fiberglass insulation with a one-inch thick thermal spacer or up to 12 inches of fiberglass insulation without a thermal spacer. The resulting assembly will enable the roof to achieve the U-Value of 0.065 BTU/hr-sf-°F without bowing the roof panels or creating seaming issues, meeting ASHRAE 90.1 specifications when R-19 (6”) insulation is required.
MBCI Releases Double E-Lok Hi-Thermal Clip
Sign up for Metal Digest
The newsletter of Metal Architecture, delivered every Thursday
This Month’s Features

Preserving perishables with the Food Bank of the Rockies’ IMP-powered facility
Empowered by hundreds of hunger relief partners and a strong force of volunteers, employees, and donors, this food bank accepts and distributes loads of...

Comprehensive building envelope solutions strengthen metal facades
These demands are exposing the limitations of traditional exterior wall assemblies, particularly those that rely on multiple control layers to manage air, water, and...

Healthy metal design: Exploring the WELL Movement concept
The WELL Standard approaches active building design through holistic design strategies that make movement a more natural part of our daily rhythms and the...

Climate zone care: perfecting air barrier placement in metal building design
Effective air and vapor control in metal buildings is not one-size-fits-all. Climate plays a decisive role in how air barriers should be designed, located,...


