Located in Napa, Calif., Napa Valley College’s new Performing Arts Center provides the school with a new, redefined campus gateway. Designed by HGA Architects and Engineers, Minneapolis, the state-of-the-art, 48,125-square-foot facility highlights the building’s importance in the region, and also creates a new landmark at the campus’ north entrance with 20-foot lobby windows.
The center provides high quality programs and services that promote learning by creating a highly technical space that can accommodate a high level of teaching standards and also host student performances. Serving both the school’s music and theater departments’ performances and instruction, the H-shaped performing arts center features four sections built around a main, 480-seat concert hall. The facility also includes a 107-seat orchestral recital space, 93-seat black box theater, 68-seat choral performance/rehearsal space, an actors’ practice area, instructional and rehearsal rooms, administrative and faculty offices, and a scene and costume shop. HGA also designed the center with catwalks, stage traps and full theater support. Additionally, the venue’s full stage house for drama can be converted to a performance setting for large musical ensembles with concert towers and an acoustical ceiling. A full orchestra pit and stage lift also support musical theater performances.
Loren Ahles, FAIA, design principal at HGA, explains that between the building’s concrete walls, three infill materials were used-metal siding, resin board and glass. The siding and resin board were used as juxtaposition against the psychologically heaviness of the concrete, providing a lighter, more playful palette to work with, he says.
Inside, perforated metal panels were used to shroud the mechanical systems, while corrugated metal panels were used as a backing material for some of the fin walls on the building’s upper level. For the project, Moon Township, Pa.-based CENTRIA supplied approximately 6,000 square feet of its Concept Series CS-660 concealed fastener metal wall panels for the primary façades and approximately 3,500 square feet of its Style-Rib exposed fastener metal wall panels for the mechanical screen walls and fin walls.
The Performing Arts Center is part of a $133.8 million Measure N bond that was passed by Napa County voters in 2002. HGA also assisted the Napa Valley College Foundation with securing private donations to enhance the project, along with participating in several presentations at fundraising events to help the college bring the project to fruition. Construction on the project began in fall 2008 and the first performances took place during fall 2010.
Napa Valley College Performing Arts Center, Napa, Calif.
Owner: Napa Valley College
Architect: HGA Architects and Engineers, Minneapolis
General contractor: Broward Construction, Davis, Calif.
Structural engineer: Forell/Elsesser Engineers, San Francisco
Civil engineers: Sandis, San Francisco, and Chardhary & Associates, Napa (Campus)
Electrical engineers: Timmons Design Engineers, San Francisco, and O’Mahony & Myer, San Rafael, Calif.
(Campus)
Mechanical engineer: Timmons Design Engineers, San Francisco
Metal wall panels: CENTRIA, Moon Township, Pa., www.centria.com/reimaginemetal


