Federal, State, Municipal & Military

Milton Fire District, Milton, N.Y.

Located in Milton, N.Y., the Milton Fire District recently underwent a renovation and expansion. The construction process took place in two stages. First, a new garage and truck bay area was dded to the existing wood building. The existing building was then reclad with Metl-Span panels to match the new addition. Munter Enterprises Inc., Middle Grove, N.Y., installed 7,400 square feet of 2-and 3-inch CF42 Tuff Wall insulated metal wall panels in Light Gray from Metl-Span, Lewisville, Texas, which give the building a stucco-like appearance. Paone Architecture PC, Saratoga Springs, N.Y., served as the architect for the project.

Metl-Span,
www.metl-span.com